Quantcast

Ch. 10: The Essential Combination

Ch. 10: The Essential Combination Page of 449 Ch. 10: The Essential Combination Text size:minus plus Restore normal size   Mail page  Print this page
SYSTEMATIC MINING
319
The method of laying out the workings is also here shown. Main tunnels are driven across the crater upon its longer axis,
and, at right angles from these, small tunnels are driven out every 30 feet until they reach the hard rock on the south side of the mine. These tunnels are widened, first along the rock until they connect one with another, and, at the same time, the roofs, or " backs," are stoped up until they are within a few feet of the
SKETCH SHOWING METHOD OF STOP1NG
Ch. 10: The Essential Combination Page of 449 Ch. 10: The Essential Combination
Suggested Illustrations
Other Chapters you may find useful
bullet Tag
This Page