Quantcast

Ch. 10: The Essential Combination

Ch. 10: The Essential Combination Page of 449 Ch. 10: The Essential Combination Text size:minus plus Restore normal size   Mail page  Print this page
332 THE DIAMOND MINES OF SOUTH AFRICA
for the tunnel, at this depth, entered the blue ground 1134 feet from the shaft, corresponding almost precisely to the distance from the mouth of the shaft to the edge of the melaphyre at the
depth of 300 feet. For hoisting service at this shaft, a winding-en­gine plant was especially designed by the late Mr. Louis I. Seymour, mechanical engineer for De Beers Consolidated Mines Limited, and constructed by James Simpson & Co., of London, England. This plant consisted of a pair of vertical tandem compound engines driving two reels. These engines were de­signed to hoist six truck-loads in one skip, from the 1000-foot level, in 45 seconds, including filling, starting, stopping, and discharging;
Ch. 10: The Essential Combination Page of 449 Ch. 10: The Essential Combination
Suggested Illustrations
Other Chapters you may find useful
bullet Tag
This Page